中国风力发电:一个警示故事Wind Power in China: A cautionary tale
- 资料类别:
- 资料大小:
- 资料编号:
- 资料状态:
- 更新时间:2021-09-09
- 下载次数:次
资料简介
Over the last 10 years, China has seen an unprecedented deployment of wind power, with capacity growing from 1.26 gigawatts (GW) in 2005 to 91.4 GW at the end of 2013 (Global Wind Energy Council, 2014).1 Notwithstanding this impressive growth, the problems encountered have included uneven resource distribution, differing location of supply and demand of power, the need to expand domestic industry and the need to achieve a proper balance of financial supports. These issues have been addressed with some success; however, others persist, such as delay in connection of wind power to the grid and curtailment of generated power from connected farms, and need to be resolved to ensure the success of future wind power development in the country. This report takes a closer look at the drivers behind the impressive wind power development in China in order to understand the complex connection between the policy goals, policy measures and development impact. In particular, it considers two related issues that have been encountered—curtailment of generation and delays in connection of projects—and how these are being addressed. The report aims to identify the lessons to be learned to inform future policy measures in China and elsewhere. The analysis finds that there are technical, governance and economic factors that have given rise to these two prominent issues. With respect to delayed connection, the technical factor is that the expansion of national wind power resources has outpaced the construction of transmission. On the governance side, we see that construction plans for wind farms and grids are not aligned, grid construction was not emphasized enough, and there was insufficient state-level oversight and coordination between the national and state levels. Economically, grid operator supports are weaker than those for power development. With respect to curtailment, there is a mismatch between supply and demand of power. The technical factor here is that curtailment has occurred in areas when growth in power demand has not matched power supply growth, leading to a “spillage” of power. Limited transmission capacity also prevents moving energy from regions of supply to where demand is greatest. Technical issues with ramping up and down conventional coal power (meaning it is slow/difficult to do) also mean that wind is often easier to curtail if curtailment is needed. A lack of integration in governance, similar to the situation in delayed connection, is a contributing factor, leading to delays in identifying and addressing this problem, including through enforcement of regulations. Additionally, at a fundamental level, the government has always targeted capacity as opposed to generation. There are also no economic incentives for grid operators to dispatch wind over other forms of generation to offset operational risks. Fixed payments provide no additional reward for thermal generators to act as reserve to wind or act in a flexible manner to support increased wind power (or at least prevent curtailment).The government has acknowledged these issues and taken steps to address them. The 2012 White Paper on China’s energy policy highlights the need to increase grid capacity. The 12th Five-Year Plan (FYP) also refers to the need to coordinate development of both grid and capacity, and there is a suggestion that the next FYP will address planning, development and integration with the goal of resolving curtailment. From a technical standpoint, forecasting, load balancing and storage, and increased connectivity are proposed to deal with the issues of connecting energy to the grid and ensuring that areas of supply and demand are properly linked. Strengthened central planning has been implemented to address governance challenges. Reformed economic incentives have also been proposed to address the economic challenges with curtailment and delayed connection. These are all examined in detail in Section 3. In some ways, China’s current challenges with wind power can be considered in terms of the country being a victim of its own success. Capacity has expanded rapidly, and the domestic industry has grown at an impressive rate. Rather than a lack of supply, the challenges of curtailment and delayed connection are issues of getting supply to demand. This could be seen as an enviable problem by many countries looking to expand renewables, but it is a problem nonetheless.
资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-09-09
-
雷竞技世界杯手机登录 化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-09-09
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-09-09
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-09-09
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-09-09
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-09-09
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-09-09
-
加拿大煤炭开采Coal Mining in Canada 2021-09-09
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-09-09
-
年终总结新年计划工作汇报PPT模板 2021-09-09
