首页 > 资料下载 > FutureGen 2.0计划设计信息系统第1卷(2013年)FUTUREGEN 2.0 PROGRAM-DEIS-Volume I(2013)
FutureGen 2.0计划设计信息系统第1卷(2013年)FUTUREGEN 2.0 PROGRAM-DEIS-Volume I(2013) FutureGen 2.0计划设计信息系统第1卷(2013年)FUTUREGEN 2.0 PROGRAM-DEIS-Volume I(2013)

FutureGen 2.0计划设计信息系统第1卷(2013年)FUTUREGEN 2.0 PROGRAM-DEIS-Volume I(2013)

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

For the FutureGen 2.0 Project, the Alliance would construct and operate a 168-megawatt electrical (MWe) gross output coal-fueled electric generation plant using advanced oxy-combustion technology. The plant would use existing infrastructure, including the existing steam turbine generator (Unit 4), at Ameren Energy Resources’ Meredosia Energy Center on the Illinois River just south of Meredosia, Illinois. The proposed project would include facilities designed to capture at least 90 percent of the carbon dioxide (CO2) that would otherwise be emitted to the atmosphere, equivalent to approximately 1.2 million tons (1.1 million metric tons) of CO2 captured per year. The captured CO2 would be compressed and transported via a new underground pipeline, approximately 30 miles long and 12 inches in diameter, to a geologic storage area in eastern Morgan County, where it would be injected and stored in the Mt. Simon Formation (a saline aquifer) approximately 4,000 to 4,500 feet below the ground surface. The project would also employ systems for the monitoring, verification, and accounting of the CO2 being geologically stored. A visitor and research center and a training facility would be sited in the vicinity of Jacksonville, Illinois. The proposed project would provide performance and emissions data, as well as establish operating and maintenance experience, that would facilitate future large-scale commercial deployment of oxy-combustion technology and geologic CO2 storage.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map