首页 > 资料下载 > CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power
CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power

CCS前端工程设计报告美国电力登山者CCS II项目一期(2012)CCS Front End Engineering & Design Report American Electric Power

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

This Front End Engineering & Design Report consolidates select nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project for Global CCS Institute. The report is based on the preliminary design information developed during the Phase I – Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: • US DOE’s Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; • Alstom’s Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; • AEP’s retrofit approach in terms of plant operational and integration philosophy; • The process island equipment and balance of plant systems for the CAP technology; • The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; • Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and • AEP’s decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map