首页 > 资料下载 > RTI暖气净化技术的可行性分析Preliminary Feasibility Analysis of RTI Warm Gas Cleanup (WGCU) Technology
RTI暖气净化技术的可行性分析Preliminary Feasibility Analysis of RTI Warm Gas Cleanup (WGCU) Technology RTI暖气净化技术的可行性分析Preliminary Feasibility Analysis of RTI Warm Gas Cleanup (WGCU) Technology

RTI暖气净化技术的可行性分析Preliminary Feasibility Analysis of RTI Warm Gas Cleanup (WGCU) Technology

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

contracted Nexant, Inc. (Nexant) to perform a high-level techno-economic assessment of their warm gas cleanup (WGCU) technology for integrated gasification combined cycle (IGCC) applications. Nexant was to develop conceptual IGCC plant designs with which the feasibility of WGCU for high temperature H2S removal can be evaluated in comparison with a conventional acid gas removal (AGR) technology. A state-of-the-art 600 MWe IGCC conceptual plant design based on Selexol AGR was chosen as the reference plant, using two different Illinois No. 6 coal feeds from the DOE NETL’s Quality Guidelines for Energy System Studies document. The IGCC facility is to be a greenfield plant located in the Midwest United States, next to the Mississippi River, where large equipment can be easily barged to site. Figure 1.1 shows an overall block flow diagram (BFD) of the reference IGCC plant (Reference IGCC) showing the inter-connectivity of the various major processing plants. The corresponding BFD of the WGCU based IGCC plant (WGCU IGCC) is shown in Figures 1.2. The overall performance comparisons of the Reference IGCC de

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map