This environmental impact statement (EIS) assesses the potential environmental impacts of constructing and operating a power plant proposed by Southern Company, through its subsidiaries, Southern Company Services, Inc. (SCS), and Mississippi Power Company (Mississippi Power), and the opening and operating of a lignite mine proposed by North American Coal Corporation (NACC). Both facilities would be located adjacent to each other in east-central Mississippi. The proposed power plant would be built in Kemper County and would demonstrate an advanced integrated gasification combined-cycle (IGCC) generation system. The facility would convert lignite into a synthesis gas (syngas) for generating 582 megawatts (MW) (nominal capacity) of electricity, while reducing emissions of carbon dioxide (CO2), sulfur dioxide (SO2), oxides of nitrogen (NOx), mercury, and particulates compared to conventional lignite-fired power plants. New transmission lines and transmission and distribution line upgrades, a natural gas pipeline, a reclaimed water pipeline, and CO2 pipelines would be constructed in connection with the power plant. NACC’s proposed lignite mine would be located on adjoining properties in Kemper County but would extend into Lauderdale County.

资料截图
Baidu
map