首页 > 资料下载 > 最终报告第5部分Section5-FINAL
最终报告第5部分Section5-FINAL 最终报告第5部分Section5-FINAL

最终报告第5部分Section5-FINAL

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

Following completion of the 4.5-year demonstration in late 2014, three scenarios would be reasonably foreseeable: (1) a successful demonstration of the Orlando Gasification Project followed immediately by commercial operation of the facilities at approximately the same production level; (2) an unsuccessful demonstration followed by continued commercial operation of the combinedcycle power-generating unit using the gasifier to the extent possible, while using natural gas to serve the balance of the combined-cycle unit’s requirements not met by the gasifier; and (3) an unsuccessful demonstration followed by continued commercial operation of the combined-cycle unit using natural gas exclusively. The demonstration would be considered successful if the results indicate that continued operation of the gasifier to fully meet the fuel needs of the combined-cycle unit would be economically and environmentally viable (i.e., the project would be demonstrating commercially competitive performance in terms of availability, thermal efficiency, emissions, and cost of electricity). However, if the fuel needs of the combined-cycle unit would need to be met or supplemented by using natural gas for continued commercial operation, then the demonstration of synthesis gas production by coal gasification would be considered unsuccessful.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map