The proposed facilities’ main site would occupy about 35 acres, and a short onsite transmission line (approximately 3,200 ft in length) would occupy a small amount of additional land. The facilities would consume resources including coal, natural gas, water, and small quantities of process chemicals, paints, degreasers, and lubricants (Section 8). The proposed facilities would use some of the existing Stanton Energy Center’s infrastructure (e.g., roads, rail loop, rail car unloading building, and natural gas line), which would reduce duplication of facilities and infrastructure. The project would generate air emissions, liquid effluents, and solid wastes. However, no process waste streams or water treatment discharges would be released off the site. Gasification ash would be used beneficially to the extent possible and would be placed in the onsite landfill only if no beneficial use were found. Anhydrous ammonia and sulfur byproducts would be recovered and marketed.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map