Mesaba能源项目EIS草案-附录C空气排放风险分析数据MESABA ENERGY PROJECT DRAFT EIS – APPENDIX C Air Emission Risk Analysis
- 资料类别:
- 资料大小:
- 资料编号:
- 资料状态:
- 更新时间:2021-09-09
- 下载次数:次
资料简介
Excelsior Energy Inc. (Excelsior), an independent energy development company based in Minnetonka, MN, is proposing to build, own and operate (potentially under agreement with an operating company) the Mesaba Energy Project (the “Project”), an Integrated Coal Gasification Combined Cycle (IGCC) power plant located on Minnesota’s Iron Range. The Project consists of a proposed two-phase generating station, each phase of which would nominally generate 600 megawatts of electricity (MWe) for export to the electrical grid. The commercial in-service date for Phase I is scheduled for 2011; Phase II is scheduled for 2013.
资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-09-09
-
雷竞技世界杯手机登录 化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-09-09
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-09-09
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-09-09
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-09-09
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-09-09
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-09-09
-
加拿大煤炭开采Coal Mining in Canada 2021-09-09
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-09-09
-
年终总结新年计划工作汇报PPT模板 2021-09-09
