The objective of the Cost and Performance Baseline for Fossil Energy Plants; Volume 1 (Bituminous Coal and Natural Gas to Electricity) is to determine cost and performance estimates of the near-term commercial offerings for power plants, both with and without current technology for carbon capture and sequestration (CCS). The study uses consistent design requirements for all technologies examined, as well as up-to-date performance and capital cost estimates. The study timeframe focuses on plants built now and commissioned in 2010. Each plant is built at a greenfield site in the midwestern United States.