弗吉尼亚州能源项目CEPAS C&D废物生物量项目 (弗吉尼亚里士满)无重大影响FINDING OF NO SIGNIFICANT IMPACT FOR THE VIRGINIA STATE ENER
- 资料类别:
- 资料大小:
- 资料编号:
- 资料状态:
- 更新时间:2021-10-08
- 下载次数:次
资料简介
SUMMARY: DOE completed the Final Environmental Assessment for Virginia State Energy Program's Cephas C&D Wastes Biomass Project, Richmond, VA (DOE/EA-1767). Based on the analyses in the Environmental Assessment (EA), DOE determined that its proposed action allowing Virginia to use some of its State Energy Program (SEP) funds, as a grant, to assist in the funding of the Cephas biomass project, would result in no significant adverse impacts. DOE further determined that there could be beneficial impacts as the proposed facility would manufacture biomass to provide local industries with an alternative energy source that, when consumed, would result in less environmental impact by releasing lower concentrations of greenhouse gasses. Furthermore, recycled construction and demolition (C&D) debris would be sold as a commodity to recycling facilities thereby stuengthening the market for recycled materials. In addition, beneficial local socioeconomic impacts would occur from increased employment opportunities and spending in the affected communities.
资料截图
上一条:田纳西州海伍德县西部太阳能农场项目缓解行动计划MITIGATION ACTION PLAN FOR THE WEST TENNESSEE SOLAR FARM PROJECT HAYWOOD COUN
下一条:20.76GW wind power, photovoltaic parity project released, Tongwei polycrystalline silicon battery pr
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
热门推荐
-
化学工程手册(第三版套装5册第1卷2卷3卷4卷5卷)袁渭康 王静康 费维扬 欧阳平凯 著 2021-10-08
-
雷竞技世界杯手机登录 化工自动控制设计手册(第四版) 黄步余 化工出版社 2020年 2021-10-08
-
化工过程模拟实训——Aspen Plus教程(第二版)孙兰义 化学工业出版社 2017年 2021-10-08
-
化工装置实用操作技术指南 韩文光2001年化学工业出版社 2021-10-08
-
HAZOP分析方法及实践 粟镇宇 化学工业出版社2018年 2021-10-08
-
工业除尘设备设计手册 张殿印 申丽 化工出版社 2012年 2021-10-08
-
回转窑(设计、使用与维修)沈阳铝镁设计院、长沙有色冶金设计院共同编写 2021-10-08
-
加拿大煤炭开采Coal Mining in Canada 2021-10-08
-
化工节能技术手册 王文堂 2006年化学工业出版社 2021-10-08
-
年终总结新年计划工作汇报PPT模板 2021-10-08
