首页 > 资料下载 > 附录E美国水域调查报告APPENDIX E INVESTIGATION FOR WATERS OF THE U.S. REPORT
附录E美国水域调查报告APPENDIX E INVESTIGATION FOR WATERS OF THE U.S. REPORT 附录E美国水域调查报告APPENDIX E INVESTIGATION FOR WATERS OF THE U.S. REPORT

附录E美国水域调查报告APPENDIX E INVESTIGATION FOR WATERS OF THE U.S. REPORT

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

American Electric Power Service Corporation (AEP) and the United States (U.S.) Department of Energy (DOE), as lead federal agency, are proposing to construct a commercial-scale carbon capture and storage (CCS) facility at its existing Mountaineer Power Plant (a 1,300 megawatt [MW] plant) and other AEPowned properties in Mason County, West Virginia. This project (referred to as the Mountaineer CCS II Project) would capture carbon dioxide (CO2) from this existing pulverized coal power plant located near New Haven, West Virginia, transport the captured CO2 by pipeline to well locations within 12 miles of the plant, and inject approximately 1.5 million metric tons of captured CO2 into saline formations approximately 1.5 miles below the earth's surface (for permanent geologic storage). AEP is seeking financial assistance from DOE for the proposed project.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map