首页 > 资料下载 > TCEP环境影响报告草案摘要(2011年)TCEP Draft EIS summary(2011)
TCEP环境影响报告草案摘要(2011年)TCEP Draft EIS summary(2011) TCEP环境影响报告草案摘要(2011年)TCEP Draft EIS summary(2011)

TCEP环境影响报告草案摘要(2011年)TCEP Draft EIS summary(2011)

  • 资料类别:
  • 资料大小:
  • 资料编号:
  • 资料状态:
  • 更新时间:2021-09-09
  • 下载次数:
资料简介

The United States (U.S.) Department of Energy (DOE) proposes to award financial assistance to Summit Texas Clean Energy, LLC (Summit) for the Texas Clean Energy Project (TCEP or project), a proposed coal-based electric power and chemicals production plant (referred to as a polygeneration or polygen plant). Summit would plan, design, construct, and operate the TCEP, including a three-year demonstration phase at the beginning of plant operations. The plant is expected to operate for at least 30 years. Plant design would combine carbon dioxide (CO2) capture with an integrated gasification combined-cycle (IGCC) power production system, and captured CO2 would be sold on the regional market for enhanced oil recovery (EOR), resulting in permanent sequestration of the CO2.

资料截图
版权:如无特殊注明,文章转载自网络,侵权请联系cnmhg168#163.com删除!文件均为网友上传,仅供研究和学习使用,务必24小时内删除。
Baidu
map